Generally, ALE is for the shortest time to rebuild, not to exceed 12 or 24 months. Additional living expenses may be limited by time or dollar amount. Examples of additional living expenses are: an apartment or motel room, restaurant meals, and laundromat expenses. If an adequately insured homeowner experiences a loss so severe that the home is uninhabitable, the insured can be reimbursed for additional living expenses required to maintain temporary housing off-site. It makes the concrete most plastic or workable while adding a host of benefits, making concrete stronger.Īdditional living expense coverage is generally included in the Loss of Use expenses section of the homeowner policy. The air brake prevents stagnant garbage disposal from entering the dishwasher by allowing air into the line which prevents a siphon from forming.Ī coil configured to remove heat from refrigerant gas.Ī flue which may consist of double or triple pipes in which heated gases rising out of the inner flue creates a draft that pulls cool air through the outer pipe(s).Ī type of admixture that is actually a detergent which produces small, evenly spaced bubbles in concrete mix. The use and size of gravel varies depending on whether the product is concrete (sand plus gravel larger than 1/4 inch), grout (sand plus gravel 1/4 inch or smaller), mortar, or plaster (sand only).Ī connection added into the drain line that runs from the dishwasher to the garbage disposal. Among the most common admixtures are those that improve plasticity, retard or advance hydration, or add color. The Activity Report window displays a list of activities (to-do items) that apply to the open estimate.Īctual Cash Value is the cost to purchase a new items to replace a damaged, lost, or stolen item, less applicable depreciation, wear, or obsolescence.Ĭhemicals added to the water, cement, aggregate mix when making concrete. To view the Activity Calendar from the Control Center, click the Xactimate tab and select Tools. Within the Activity Calendar you can view and edit activities for all projects that you are working on and receive reminders of the date and time an activity needs to be completed. The two primary methods for access are to build a temporary road close enough to the forms so that the truck can reach them or to use a concrete pump.Ī type of PB pipe fitting, usually used with aluminum crimp rings, that commonly fails. The method used to get the concrete from the improved road used by the delivery truck into the forms. The 4/1 Rule states that for every four feet of working ladder length, the base of the ladder should be one foot out from the top support point. A rule that states that the top of a flue must be at least two feet higher than any roof part within ten feet.Ī rule for safe placement of a ladder.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |